For the CEO or CTO who owns the date

The program is off track.
I get it delivering.

Deadlines, goals, deliverables, and the metric that decides success — reset from inside the work. Not from another report.

I’m Steve Chandler, ReleaseGenius. Thirty years inside complex product and manufacturing systems at five global food and consumer companies. I’m brought in when the organization has already decided it cannot be done.

The record, before the scroll

200+

products taken to market

6

U.S. patents — four at Frito-Lay, two on BudBot

5

global food and consumer companies, as VP or senior director

$1B+

Tostitos Scoops annual sales, still in market

Frito-Lay · Sara Lee · Diageo · Kellogg’s · Starbucks

The break

You do not need a diagnosis of culture. You need the program to produce the result.

A critical program is late. The status report is still green. The deliverable is not in hand. The goal has drifted off the real constraint. The metric everyone manages is not the metric that decides whether you ship.

That is not a people problem. More effort will not fix it. Another alignment meeting will not fix it. The system producing the miss has to change — from the inside, where the date is actually decided.

01DeadlineThe date keeps moving because the constraint was never in the plan.
02GoalThe target no longer matches what the system can actually do.
03DeliverableWork is described as done. It is not done.
04MetricThe dashboard reports progress. It does not report the break.

What this is not

Not a strategy retainer. Not a facilitation. Not a report you already suspect. I work inside the program that owns the date.

The engagement

Five moves. Then your team runs it.

Clarity is fast. Execution is what makes it different. I don’t hand you a report and leave — I leave you a system your team can run.

01

Name the break

A two-week diagnostic, fixed scope. Not a study. What is actually off. What is false progress. What has to stop before more effort helps.

02

Put the constraint in the plan

Technical, process, or ownership. The limit the schedule is pretending is not there. This is where thirty years of invention shows up — as the thing that makes the date possible.

03

Rebuild execution

One owner of the date. A sequence the plant, the lab, or the team can actually run. A metric that moves only when the work moves.

04

Lead it to delivery

About 90 days. I lead remotely week to week and come on site for scheduled sprints at the points that decide the date. The engagement is judged by the result, not the readout.

05

Hand it back

Your team runs it after I leave. The owner, the sequence, and the metric stay in place — run by the people who ran them with me.

And when something new must be built and cannot fail, I architect it from the start.

The record

Proven where it had already failed, or been judged impossible.

These were not advisory assignments. They were programs under a real date, a real plant, and a constraint the existing system could not absorb. Every figure here is one I can walk you through.

Frito-Lay · Product and process

Tostitos Scoops

$1B+annual sales, one product

A three-dimensional chip the line could not make. Shape, equipment, and process invented together. Three U.S. patents. Still in market, over $1 billion a year.

Frito-Lay · Brand-scale change

Lay’s reformulation

+7%in one year

Second formula change in about fifty years on a $2.1 billion brand. Best-tasting Lay’s in consumer research. Revenue from $2.1B to $2.25B.

Frito-Lay · Under launch pressure

Reduced Fat Doritos

33%less fat

Formulation and process equipment the plants could run. Three plants built and started in 14 months on $70 million of capital. One U.S. patent and $35 million in annual sales. The constraint was removed, then commercialized.

Frito-Lay · The lines already there

Tostitos process

+25%efficiency, 30 lines

Oven redesign so new products could run on thirty lines — and the $1 billion Tostitos system got more efficient, not less.

BudBot · built from zero

Precision automation for regulated manufacturing

Fill accuracy to ±0.02 g. Two U.S. patents, 43 claims. Sold commercially at $220,000 per unit. After commissioning, the state changed the rules — I invented and prototyped an inline weigher in response.

Also on the CV: microwave dough-to-crust · commercial coffee equipment rebuild · spirits bottle model, about $1 million in tooling avoided.

Why this works

This is not advisory.
This is execution.

Most firms advise.

They analyze, facilitate, and report. They work on what is presented to them. That is not where a missed date is decided.

I work inside it.

On what is actually happening, not what is being reported. At the constraint, with the owner of the date, on the metric that decides it.

Leadership

Steve Chandler, ReleaseGenius

Steve Chandler, ReleaseGenius

B.S. Mechanical Engineering, University of Illinois. Executive education, Kellogg. Thirty years building, recovering, and scaling complex product systems as VP and senior director at Frito-Lay, Sara Lee, Diageo, Kellogg’s, and Starbucks. Founder of BudBot and ReleaseGenius. Six U.S. patents.

I’m brought in when

the problem is not clear, the system is not working, and failure is becoming likely.

I’m known for

seeing the constraint others miss, and reorganizing the system that is not producing the result.

I leave when

the program delivers and your team runs it without me. No handoff into a slide.

How it starts

Engage when the date is real.

If another quarter of false progress has a cost, start with a direct conversation with me. No buffer team between the insight and the action.

01

Forty-five minutes

With you, the CEO or CTO. The program, the date, what done means, what has already been tried.

02

A two-week diagnostic, fixed scope

Where it is actually breaking. What to stop. What has to be reset before more effort helps.

03

Embedded execution

Only if the program can be recovered. About 90 days of remote leadership plus scheduled on-site sprints — then your team runs it.

releasegenius.com